PQC strategy and roadmap

A plan executives can decide on.

We turn what the readiness assessment found into a gated, wave-based roadmap, with the decisions, costs and dates leaders need before they commit.

11 phases, four stages

Every phase closes on a gate with measurable exit criteria.

Private- and public-sector editions

Built for the obligations each sector actually faces.

Standards-aligned

NIST FIPS 203, 204 and 205, NIST IR 8547 and NSA CNSA 2.0.

The clock

The deadlines are set. The real one is closer than it looks.

NIST’s final transition plan deprecates every quantum-vulnerable public-key algorithm after 2030 and disallows them after 2035, whatever the key size. Replacing PKI, HSMs and embedded systems takes years, so 2030 is the date that shapes most plans.

Now

Harvest now, decrypt later

Data captured today can be read once a quantum computer exists. Long-lived data is already exposed.

2030

Deprecated

RSA, elliptic-curve and Diffie-Hellman are deprecated under NIST guidance at every key size.

2035

Disallowed

Quantum-vulnerable public-key algorithms are no longer allowed under NIST standards.

Target

Your date, set earlier

We set an internal target ahead of the date that governs you, with room for slips.

National security systems follow NSA CNSA 2.0, which sets earlier milestones.

The framework

Eleven phases in four stages, each closed by a gate.

Stages run in order. Phases 8 and 9 repeat for every migration wave. Three stage gates mark the moments leaders commit: after analysis, after design and after implementation.

Stage 1 · Analysis

01 · Initiate and mobilize

02 · Discover and baseline

03 · Categorize, rationalize and prioritize

Stage 2 · Design

04 · Architect and design

05 · Evaluate and select

06 · Plan and fund

Stage 3 · Implementation

07 · Build foundations and pilot

08 · Migrate in waves

09 · Authorize, enforce and decommission

Stage 4 · Optimization

10 · Transition and close

11 · Operate and continuously improve

The roadmap

Waves, not a big bang.

A multi-year roadmap that moves the riskiest assets first, keeps every change reversible, and lets each wave learn from the last.

Retire first. The cheapest migration is cryptography you no longer need.

Foundations. Roots of trust move first: certificate authorities, HSMs and key management.

Pilot. Prove the pattern on a contained scope before it scales.

Production waves. Each wave runs a managed transition, a rescan and baseline checks, and leaves evidence.

Retirement. Classical fallback is switched off only when a named owner authorizes it.

Technical strategy

Positions we start from.

Defaults that hold up across most estates. Any change to one is a recorded decision.

Managed transition first

Classical and post-quantum key exchange run together. Post-quantum alone comes only after the retirement gate.

Roots of trust first

Certificate authorities and HSMs move before the systems that depend on them.

Migrate keys, not data

AES-256 data stays where it is. The key hierarchy that protects it moves.

The right signature for the job

ML-DSA for most signing. SLH-DSA for roots, archives and code.

Nothing retired blind

Validated, dependency-checked and restore-tested, with archive keys decided, before anything is switched off.

Crypto-agility by design

Algorithms set by policy, not compiled in, so the next change is configuration.

What you receive

Everything a steering committee needs to commit.

Private sector

NIST transition dates, PCI DSS, SEC disclosure, DORA and NIS2, and customer requirements

Public sector

Federal mandates and reporting, CNSA 2.0 for national security systems, and FIPS 140-3 validation

A cryptographic standard and target architecture

A wave plan with dates, dependencies and the critical path

A cost model and business case, staged by gate

A vendor roadmap register for the products you depend on

An executive decision brief for the design stage gate

The business case doesn’t rest on quantum alone. Crypto-agility, fewer certificate outages, faster audits and avoided rework all count.

Related services

From the roadmap to the work.

01

PQC readiness assessment

The inventory and ranked backlog the roadmap is built on.

Learn more →

03

PQC program management

Govern the roadmap from charter to cutover.

Learn more →

04

Engineering playbooks

Turn each wave into steps your engineering teams can run.

Learn more →

Need a roadmap your board will sign?

Start with a conversation about your deadlines, your estate and what has to move first.

Talk to us